Isimba back on grid, Kenya deal cancelled

Spread the love

Isimba power plant is back on the national grid after all the three power generation units were restored. The three units were shut down after the dam was flooded two weeks ago, pushing the country into load shedding that was last experienced nearly a decade ago. 

Leave a Reply

Your email address will not be published. Required fields are marked *